Welcome to mymcc Community Sign in | Join | Help

Browse by Tags

All Tags » kiln design   (RSS)
Raising the chimney, installing the doors
Mr. Proeung, working into the evening to raise the chimney. Through the roof. Yary surveys the scene from above. It's busy on the site. The metal roof is now in place; the final chimney work is in progress and the welder is installing the fire box Read More...
Share |
Posted: Saturday, September 15, 2012 1:08 PM by rackm | 1 Comments
The kiln is nearly complete
The kiln is complete except for the chimney which isn't quite at 6 meters, its full height. Plus, the fire box door is being welded off site. The artists have been at work creating pottery and sculpture for the first firing. Mr. Proeung is carving Read More...
Share |
Posted: Saturday, September 01, 2012 11:04 PM by rackm | 3 Comments
Planning day
On a planning day, before the official start of kiln building, Yary Livan (left) and Proeung Kang (on right) lay out the footprint of the kiln using tape. The walls will be 9 inches thick; this equals the length of one fire brick, or the width of two Read More...
Share |
Posted: Wednesday, June 27, 2012 4:34 PM by rackm | 0 Comments
More Posts Next page »